fbpx
Installation of Water-type System
Installation of Water-type System

Installation Instruction Liquid System

ATTENTION: Installation of Warm Baseboard «Charley» system is recommended for finishing walls and floor by qualified plumbing engineer

Tools and Materials:

Drill puncher; screw gun; angular cutting machine; horn keys 22 and 24; drills and fasteners (self-cuts, dowels) – in accordance with the wall material.

Components:

  1. Rear bar;
  2. Top bar;
  3. Closing bar;
  4. Heating module;
  5. Brackets-holders;
  6. Decorative elements (internal and external angles, tips, splicing strips);
  7. Connecting fittings;
  8. Rotary elements;
  9. Supply fittings.

1. At the place of installation of the Warm Baseboard , measure the wall and transfer the dimensions to the rear, upper and closing bars, cut off with an angular cutting machine.

2. Insert the top bar into the slots of the rear bar.

3. Insert tips from the “left/right” set into the slots of the rear bar at the beginning and end of the Warm Baseboard.

4. Press the rear bar against the wall along the floor and attach with self-cuts through every 40-45 cm.

5. Install brackets in slots of the rear plate every 25-30 cm.

6. Measure and cut off the heating module. Insert the heating module into the brackets as with force, till the click.

Important: deploy the heating module with wide lamellae inside the room, narrow to the wall.

7. Underwater fittings with 1/2 external threads are used to connect the supply pipes. In the heating system Warm Baseboard “Charley” coolant supply to the lower pipe of the heating module, and reverse – to the upper.

8. Connect the line sections of the heating module to each other using connecting fittings.

9. Using universal rotary elements 0°-90°-180° (corrugation, stainless steel) or copper rotary elements 90° connect the pipes of the heating module in the corners.

10. To establish rotary elements 180° at the end of each contour for connection of the top and lower tubes of the heating module.

11. Install the closing bar on the brackets: first put the lower part of the closing bar on the hooks of the brackets, and then snap the upper part of the closing bar with a force.

12. Install decorative elements:

  • internal and/or external angles;
  • close the joints of the external profile (upper and closing bars) with a connecting patch.

13. Upon completion of the system assembly, before starting, perform standard air removal procedures, and pressurize the system with half-time pressure from the worker.

For questions, contact the place of purchase or the manufacturer.

Open chat
Подсказка
Добрый день!
Добрый день. Вам помочь?